Design Build

Integrated Technology Delivery

ITD® Integrating Solutions that Maximize Your Technology ROI

Ready to Get Started? Schedule a Consult:

Contact Us

ITD® is Vision’s trademarked Design-Build methodology, focused on Technology solutions. ITD® enables end-users and design-build teams to maximize their technology budgets through the efficient engineering of converged technologies. With the convergence of voice, data, Wi-Fi, security systems and audio-visual networks onto a single IP-enabled infrastructure, ITD® provides for a holistic view into management of the network and bandwidth allocation, through the converged physical and virtual network management platforms.

More than a technology engineering agenda, ITD® delivers true value to your IT team through a collaborative process, defining the requirements and producing a “good/better/best” selection set of options from which you select the best feature set and budget to meet your needs. 

By efficiently collaborating early in (and throughout) the process, ITD® enables us to confidently enter the build process with the promise of best value at the lowest cost. One of the best values of ITD® is savings related to a reduction in duplication of efforts, which translates to different markup and overhead cost as well as project management cost and the overhead associated with it. ITD® provides centralized control, coordination and one hand to shake.

Eliminate costly change orders, accelerate your project, save time and lower the total cost of ownership with Vision’s ITD® approach. Enhance your project's ROI while delivering it faster!

Watch a Case Study


Need help finding your solution? Contact us to schedule a call with an expert.

Contact Us

WHY ITD?

Vision’s unique and proprietary ITD® provides the benefits of using a proven design-build methodology for the integration of technology systems. Using the industry standard, AIA's Integrated Project Delivery (IPD), in combination with Vision’s best practices and methodologies, your project will get exactly the right technologies and integrated capabilities it needs.

The benefits of ITD® include:

  • Enhances ROI
  • Save money and speed your project to completion
  • Eliminates change orders
  • Minimizes delays
  • Eliminates multiple markups
  • Delivers detailed engineering
  • Lowers overall risk
  • Increases speed to project closeout
  • Enables consistency in program management

Using our Integrated Technology Delivery methodologies, our highly experienced team (DBIA Design-Build Professionals, RCDD, BIM, CTS/CTS-D, RF, PON) will develop a tailored solution for your property. Our team will coordinate with the other design teams to develop a solution that maximizes functionality while minimizing changes as the build progresses. Delivering integrated solutions that maximize the utility of the low-voltage infrastructure, brings expertise and experience in the following specialties:

BENEFITS OF ITD?

  • Responsibility
    Singular Responsibility

    With both design and construction in the hands of a single entity, Vision is your single point of responsibility for quality, cost and schedule adherence. Our ITD team is responsible for quality, budget and schedule, as well as performance of the completed facility. Under the ITD® methodology, Vision takes responsibility for any issues requiring resolution between design and construction. 

  • Quality
    Improved Quality

    Traditional design-bid-build too often relies upon restrictive contract language, adversarial audit and inspection, and, ultimately, the legal system to ensure project quality. In the ITD® methodology, Vision is solely responsible for your completed product. This accountability drives outcome-focused quality throughout the entire process. Our ITD® methodology ensures quality from the initial consultation.

  • Cost Savings
    Cost Savings

    Our ITD® Team (engineering and construction personnel) collaboratively evaluates value-engineering designs, materials and methods efficiently and accurately. Value engineering and constructability are utilized continuously and more effectively when the engineers, contractors and vendors work as one during the entire design and construction process.

  • Time
    Time Savings

    Because design and construction are overlapped (and because bidding periods and redesigns are eliminated), total design and construction time can be significantly reduced. Design-build is ideal for the application of “fast track” construction techniques without associated risks to the owner. Material and equipment procurement as well as construction work can begin before construction documents are fully completed. The resulting time savings translates into lower costs and earlier occupancy of the completed facility. Earlier occupancy equals faster time to revenue and happier tenants.

  • ROI
    Enhanced ROI

    Change Orders can run as high as 35% of the project value. With Design-Build, one PM manages multiple scopes. It also encourages transparency in pricing, allows more effective channel and manufacturer management, and enhances collaboration with GC and trades.

American Woodmark
FEATURED PROJECT

American Woodmark

Kitchen and Bath Company Hires Vision to Consolidate Multiple Buildings into New Headquarters

MOI Teaching
ITD Project

MOI Inc.

Vision Technologies worked with MOI to design audiovisual systems to enhance the workplace experience at its flagship DC office. The result was a system that was functional and aesthetically pleasing.

Wharf
FEATURED PROJECT

The Wharf Hotel

Vision Technologies is Carr Hospitality’s exclusive technology design-build partner for the new Wharf Intercontinental Hotel